THIS KITCHEN WAS TRANSFORMED IN ONE DAY!

We installed the new Corian countertops directly on top of the existing tile to keep the mess to a minimum.

 

BEFORE AFTER
before after

SEE THE PROCESS:

8am 10am 12pm 2pm 4pm 5pm
8 AM – Arrive at Job Site 10 am – Sink Section Installed 12 pm – Pass Through Section Installed 2 pm – Cooktop Section Installed 4 pm – Peninsula Section Installed 5 pm – Job Complete!